Build in time · Example house
Watch it rise
1 Slab
Poured and cured. The ground work every other stage sits on.
2 Frame
Upper floor and roof trusses go up, craned across and tied off.
3 Lock-up
Roof, windows and doors on. The weather stays outside.
4 Fit-out
Linings, kitchen and floors. The lights come on inside.
5 Handover
Final clean and walk-through. The keys are yours.
Scroll to build, or tap a stage to jump to it.
