Build timeline
- SlabComplete. Poured and cured
- FrameCurrent stage. Upper floor and roof trusses going up
- Lock-upRoof, windows and doors
- Fit-outLinings, kitchen, floors
- HandoverFinal clean and walk-through
Latest site updates

Roof trusses landed
First of the trusses craned across and tied off before dusk.

Scaffold inspected
Edge protection checked and signed off for the upper level.

Materials delivered
Framing timber and sheet materials stacked and covered.

Ground-floor walls braced
Wall frames stood, plumbed and braced ready for the floor above.
Variations and approvals
Extra power points in the study
Four double outlets. Adds 2 days, no change to handover.
Awaiting approvalRaise the pantry window sill
Revised drawing attached. No change to the schedule.
Awaiting approvalUpgrade to double-glazed rear doors
Longer lead time. Adds 1 week to lock-up.
Awaiting approval
0 of 3 approved. Demo only: nothing is saved or sent.
Next 2 weeks
- Remaining roof trusses and bracing
- Roof battens and sarking begin
- Frame inspection booked
- Window and door delivery
- Roof sheeting starts
- Plumbing and electrical rough-in walk-through
Plan your build
How long will it take?
Pick your project and see an indicative build window in months. Sample figures only. This is not a quote and no prices are shown.
Book a site chat
Tell us a little and we will call to arrange a time on your block. Demo form: nothing is sent.
Thanks, that is the demo done
On a real site this would reach the Harlow & Reid office and someone would ring you back. Nothing was sent or saved.